Glossary Definitions
Glossary of terms.
-
Assignment - ActualCost
#
- The actual cost incurred on the assignment.
-
Assignment - ActualFinish
#
- The actual finish date of the assignment.
-
Assignment - ActualOvertimeCost
#
- The actual overtime cost incurred on the assignment.
-
Assignment - ActualOvertimeWork
#
- The actual amount of overtime work incurred on the assignment.
-
Assignment - ActualOvertimeWorkProtected
#
- Specifies the duration through which actual overtime work is protected.
-
Assignment - ActualStart
#
- The actual start date of the assignment.
-
Assignment - ActualWork
#
- The actual amount of work incurred on the assignment.
-
Assignment - ActualWorkProtected
#
- Specifies the duration through which actual work is protected.
-
Assignment - ACWP
#
- The actual cost of work performed on the assignment to-date.
-
Assignment - Assignment
#
- There must be at least one assignment in each Assignments collection.
-
Assignment - Assignments
#
- The collection of assignments that make up the project.
-
Assignment - Baseline
#
- The collection of baseline values associated with the assignment.
-
Assignment - BCWP
#
- The budgeted cost of work performed on the assignment to-date.
-
Assignment - BCWS
#
- The budgeted cost of work on the assignment.
-
Assignment - BookingType
#
- Specifies the booking type of the assignment. 1=Commited, 2=Proposed
-
Assignment - Confirmed
#
- Whether the Resource has accepted all of his or her assignments.
-
Assignment - Cost
#
- The projected or scheduled cost of the assignment.
-
Assignment - CostRateTable
#
- The cost rate table used for the assignment.
-
Assignment - CostVariance
#
- The difference between the cost and baseline cost for a resource.
-
Assignment - CreationDate
#
- The date that the assignment was created.
-
Assignment - CV
#
- Earned value cost variance.
-
Assignment - Delay
#
- The amount that the assignment is delayed.
-
Assignment - DurationFormat
#
- The format for expressing the bulk duration. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.
-
Assignment - ExtendedAttribute
#
- The value of an extended attribute. Two pieces of data are necessary - a pointer back to the extended attribute table which is specified either by the unique ID or the Field ID, and the value which is specified either with the value, or a pointer back to the value list.
-
Assignment - FieldID
#
- The field ID in the localised language.
-
Assignment - Finish
#
- The scheduled finish date of the assignment.
-
Assignment - FinishVariance
#
- The variance of the assignment finish date from the baseline finish date.
-
Assignment - FixedMaterial
#
- Whether the consumption of the assigned material resource occurs in a single, fixed amount.
-
Assignment - HasFixedRateUnits
#
- Whether the Units are Fixed Rate.
-
Assignment - Hyperlink
#
- The title of the hyperlink associated with the assignment.
-
Assignment - HyperlinkAddress
#
- The hyperlink associated with the assignment.
-
Assignment - HyperlinkSubAddress
#
- The document bookmark of the hyperlink associated with the assignment.
-
Assignment - LevelingDelay
#
- The delay caused by leveling.
-
Assignment - LevelingDelayFormat
#
- The format for expressing the duration of the delay. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.
-
Assignment - LinkedFields
#
- Whether the Project is linked to another OLE object.
-
Assignment - Milestone
#
- Whether the assignment is a milestone.
-
Assignment - Notes
#
- Text notes associated with the assignment.
-
Assignment - Number
#
- The unique number of the baseline data record.
-
Assignment - Overallocated
#
- Whether the assignment is overallocated.
-
Assignment - OvertimeCost
#
- The sum of the actual and remaining overtime cost of the assignment.
-
Assignment - OvertimeWork
#
- The scheduled overtime work scheduled for the assignment.
-
Assignment - PercentWorkComplete
#
- The amount of work completed on the assignment.
-
Assignment - RegularWork
#
- The amount of non-overtime work scheduled for the assignment.
-
Assignment - RemainingCost
#
- The remaining projected cost of completing the assignment.
-
Assignment - RemainingOvertimeCost
#
- The remaining projected overtime cost of completing the assignment.
-
Assignment - RemainingOvertimeWork
#
- The remaining overtime work scheduled to complete the assignment.
-
Assignment - RemainingWork
#
- The remaining work scheduled to complete the assignment.
-
Assignment - ResourceUID
#
- The unique identifier of the resource.
-
Assignment - ResponsePending
#
- True if a response has not been received for a TeamAssign message.
-
Assignment - Resume
#
- The date that the assignment resumed.
-
Assignment - Start
#
- The scheduled start date of the assignment.
-
Assignment - StartVariance
#
- The variance of the assignment start date from the baseline start date.
-
Assignment - Stop
#
- The date that the assignment was stopped.
-
Assignment - TaskUID
#
- The unique identifier of the task.
-
Assignment - TimephasedData
#
- The time phased data associated with the Baseline.
-
Assignment - UID
#
- The unique identifier of the assignment.
-
Assignment - Units
#
- The number of units for the assignment.
-
Assignment - UpdateNeeded
#
- True if the resource assigned to a task needs to be updated as to the status of the task.
-
Assignment - VAC
#
- The difference between basline cost and total cost.
-
Assignment - Value
#
- The actual value of the extended attribute.
-
Assignment - ValueID
#
- The ID of the value in the extended attribut lookup table.
-
Assignment - Work
#
- The amount of scheduled work for the assignment.
-
Assignment - WorkContour
#
- The work contour of the assignment. Values are: 0=Flat, 1=Back Loaded, 2=Front Loaded, 3=Double Peak, 4=Early Peak, 5=Late Peak, 6=Bell, 7=Turtle, 8=Contoured
-
Assignment - WorkVariance
#
- The variance of assignment work from the baseline work as minutes x 1000.
-
Calendar - BaseCalendarUID
#
- The unique identifier of the base calendar on which this calendar depends. Only applicable if the calendar is not a base calendar.
-
Calendar - Calendar
#
- Calendars are used to define standard working and non-working times. Projects must have one base calendar. Tasks and resources may have their own non-base calendars which are based on a base calendar.
-
Calendar - Calendars
#
- The collection of calendars that is associated with the project.
-
Calendar - DayType
#
- The type of day. Values are: 0=Exception, 1=Monday, 2=Tuesday, 3=Wednesday, 4=Thursday, 5=Friday, 6=Saturday, 7=Sunday
-
Calendar - DayWorking
#
- Whether the specified date or day type is working.
-
Calendar - FromDate
#
- The beginning of the exception time.
-
Calendar - FromTime
#
- The beginning of the working time.
-
Calendar - IsBaseCalendar
#
- Whether the calendar is a base calendar.
-
Calendar - Name
#
- The name of the calendar.
-
Calendar - TimePeriod
#
- Defines a contiguous set of exception days.
-
Calendar - ToDate
#
- The end of the exception time.
-
Calendar - ToTime
#
- The end of the working time.
-
Calendar - UID
#
- The unique identifier of the calendar.
-
Calendar - WeekDay
#
- A weekday either defines regular days of the week or exception days in the calendar.
-
Calendar - WeekDays
#
- The collection of Weekdays that defines this calendar.
-
Calendar - WorkingTime
#
- Defines the working time during the weekday.
-
Calendar - WorkingTimes
#
- The collection of working times that define the time worked on the weekday. One of these must be present, and there may be no more than five.
-
Extended Attributes - Alias
#
- The alias of the custom field
-
Extended Attributes - AppendNewValues
#
- If AppendNewValues=True then any new values added in a project are automatically appended to the list.
-
Extended Attributes - CalculationType
#
- Whether rollups are calculated for task and group summary rows. Values are: 0=None, 1=Rollup, 2=Calculation
-
Extended Attributes - Default
#
- This points to the default value in the list. Not present if no default is set.
-
Extended Attributes - Description
#
- The description of the value in the list.
-
Extended Attributes - ExtendedAttribute
#
- Each of the individual entries in the extended attributes definition collection. There are no limits to the number of children that may appear, but project will only understand Flag1-Flag10, etc. This must appear once in each ExtendedAttributes collection.
-
Extended Attributes - ExtendedAttributes
#
- The collection of extended attribute (custom field) definitions associated with the project.
-
Extended Attributes - FieldID
#
- This corresponds to the PID of the custom field.
-
Extended Attributes - FieldName
#
- The name of the custom field.
-
Extended Attributes - Formula
#
- The formula that Microsoft Project uses to populate the custom task field.
-
Extended Attributes - ID
#
- Unique ID of value across the project.
-
Extended Attributes - PhoneticAlias
#
- The phonetic pronunciation of the alias of the custom field
-
Extended Attributes - RestrictValues
#
- If RestrictValues=True then only values in the list are allowed in the file
-
Extended Attributes - RollupType
#
- How rollups are calculated. Values are: 0=Maximum (OR for flag fields), 1=Minimum (AND for flag fields), 2=Count all, 3=Sum, 4=Average, 5=Average First Sublevel, 6=Count First Sublevel, 7=Count Nonsummaries
-
Extended Attributes - Value
#
- The values that make up the value list.
-
Extended Attributes - ValueList
#
- When values of extended attributes are specified as properties of elements in the schema, they may either be specified by values or by references to the values contained in this list. Applications may assume ordering of the list by ordering specified here.
-
Extended Attributes - ValuelistSortOrder
#
- How value lists are sorted. Values are: 0=Descending, 1=Ascending
-
Outline - Alias
#
- The alias of the custom outline code.
-
Outline - AllLevelsRequired
#
- New codes must have all levels present. Not available for Enterprise Codes.
-
Outline - Description
#
- A description of this value.
-
Outline - Enterprise
#
- Indicates whether the custom outline code is an enterprise custom outline code.
-
Outline - EnterpriseOutlineCodeAlias
#
- A reference to another custom field for which this is an alias.
-
Outline - FieldID
#
- Coresponds to the field number of outline code.
-
Outline - FieldName
#
- The name of the custom outline code.
-
Outline - LeafOnly
#
- Whether or not values specified in this outline code field must be leaf values.
-
Outline - Length
#
- The maximum length in characters of the outline code values. If length is any, the value is zero.
-
Outline - Level
#
- The level of the mask.
-
Outline - Mask
#
- The four elements of the mask constitute the format in which the outline code must appear.
-
Outline - Masks
#
- The table of entries that define the outline code mask.
-
Outline - OnlyTableValuesAllowed
#
- Whether values specified must come from values table.
-
Outline - OutlineCode
#
- The individual outline codes.
-
Outline - OutlineCodes
#
- The collection of outline code definitions associated with the project. These codes may be associated only with this project, or may be common among several projects (enterprise codes).
-
Outline - ParentValueID
#
- The value of the parent node of the outline code.
-
Outline - PhoneticAlias
#
- The phonetic pronunciation of the alias of the custom outline code.
-
Outline - ResourceSubstitutionEnabled
#
- Whether the custom outline code can be used by the Resource Substitution Wizard in Microsoft Project.
-
Outline - Separator
#
- The separator value of the code values.
-
Outline - Type
#
- The type of mask. Values are: 0=Numbers, 1=Upper Case Letters, 2=Lower Case Letters, 3=Characters
-
Outline - Value
#
- The individual values.
-
Outline - ValueID
#
- The unique ID of the outline code value across the project.
-
Outline - Values
#
- The values of the table associated with this outline code.
-
Project - ActualsInSync
#
- Whether all actual work has been synchronized with the project.
-
Project - AdminProject
#
- Whether the project is an administrative project.
-
Project - Author
#
- The author of the project.
-
Project - AutoAddNewResourcesAndTasks
#
- Whether to automatically add new resources to the resource pool.
-
Project - Autolink
#
- Whether to autolink inserted or moved tasks.
-
Project - BaselineForEarnedValue
#
- The specific baseline used to calculate Variance values. Values are: 0=Baseline, 1=Baseline 1, 2=Baseline 2, 3=Baseline 3, 4=Baseline 4, 5=Baseline 5, 6=Baseline 6, 7=Baseline 7, 8=Baseline 8, 9=Baseline 9, 10=Baseline 10
-
Project - CalendarUID
#
- The project calendar. Refers to a valid UID in the Calendars element of the Microsoft Project XML Schema.
-
Project - Category
#
- The category of the project.
-
Project - Company
#
- The company that owns the project.
-
Project - CreationDate
#
- The date that the project was created.
-
Project - CriticalSlackLimit
#
- The number of days past its end date that a task can go before Microsoft Project marks that task as a critical task.
-
Project - CurrencyDigits
#
- The number of digits after the decimal symbol.
-
Project - CurrencySymbol
#
- The currency symbol used in the project.
-
Project - CurrencySymbolPosition
#
- The position of the currency symbol. Values are: 0=Before, 1=After, 2=Before With Space, 3=After with space.
-
Project - CurrentDate
#
- The system date that the XML was generated.
-
Project - DaysPerMonth
#
- The number of days per month.
-
Project - DefaultFinishTime
#
- The default finish time of new tasks.
-
Project - DefaultFixedCostAccrual
#
- The default from where fixed costs are accrued. Values are: 1=Start, 2=Prorated, 3=End
-
Project - DefaultOvertimeRate
#
- The default overtime rate for new resources.
-
Project - DefaultStandardRate
#
- The default standard rate for new resources.
-
Project - DefaultStartTime
#
- The default start time of new tasks.
-
Project - DefaultTaskEVMethod
#
- The default earned value method for tasks. Values are: 0=Percent Complete, 1=Physical Percent Complete
-
Project - DefaultTaskType
#
- The default type of new tasks. Values are: 0=Fixed Units, 1=Fixed Duration, 2=Fixed Work.
-
Project - DurationFormat
#
- The format for expressing the bulk duration. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.
-
Project - EarnedValueMethod
#
- The default method for calculating earned value. Values are: 0=Percent Complete, 1=Physical Percent Complete
-
Project - EditableActualCosts
#
- Whether or not actual costs are editable.
-
Project - ExtendedCreationDate
#
- Date used for calculation and reporting.
-
Project - FinishDate
#
- The finish date of the project. Required if ScheduleFromStart is false.
-
Project - FiscalYearStart
#
- Specifies whether to use fiscal year numbering
-
Project - FYStartDate
#
- Fiscal Year starting month. Values are: 1=January, 2=February, 3=March, 4=April, 5=May, 6=June, 7=July, 8=August, 9=September, 10=October, 11=November, 12=December
-
Project - HonorConstraints
#
- Whether tasks honour their constraint dates.
-
Project - InsertedProjectsLikeSummary
#
- Whether to calculate subtasks as summary tasks.
-
Project - LastSaved
#
- The date that the project was last saved.
-
Project - Manager
#
- The manager of the project.
-
Project - MicrosoftProjectServerURL
#
- Whether the project was created by a Project Server user as opposed to an NT user.
-
Project - MinutesPerDay
#
- The number of minutes per day.
-
Project - MinutesPerWeek
#
- The number of minutes per week.
-
Project - MoveCompletedEndsBack
#
- Specifies whether the end of completed portions of tasks scheduled to begin after the status date but begun early should be moved back to the status date.
-
Project - MoveCompletedEndsForward
#
- Specifies whether the end of completed portions of tasks scheduled to have been completed before the status date but begun late should be moved up to the status date.
-
Project - MoveRemainingStartsBack
#
- Specifies whether the beginning of remaining portions of tasks scheduled to begin after the status date but begun early should be moved back to the status date.
-
Project - MoveRemainingStartsForward
#
- Specifies whether the beginning of remaining portions of tasks scheduled to have begun late should be moved up to the status date.
-
Project - MultipleCriticalPaths
#
- Whether multiple critical paths are calculated.
-
Project - Name
#
- The name of the project.
-
Project - NewTasksEffortDriven
#
- Whether new tasks are effort driven.
-
Project - NewTasksEstimated
#
- Whether to show the estimated duration by default.
-
Project - NewTaskStartDate
#
- The default date for new tasks start. Values are: 0=Project Start Date, 1=Current Date
-
Project - Project
#
- The project is the top level element of the document.
-
Project - ProjectExternallyEdited
#
- Whether the project XML was edited.
-
Project - RemoveFileProperties
#
- Whether to remove all file properties on save.
-
Project - Revision
#
- The number of times a project has been saved.
-
Project - ScheduleFromStart
#
- Whether the project is schduled from the start date or finish date.
-
Project - SplitsInProgressTasks
#
- Whether in-progress tasks can be split.
-
Project - SpreadActualCost
#
- Whether actual costs are spread to the status date.
-
Project - SpreadPercentComplete
#
- Whether percent complete is spread to the status date.
-
Project - StartDate
#
- The start date of the project. Required if ScheduleFromStart is true.
-
Project - StatusDate
#
- Date used for calculation and reporting.
-
Project - Subject
#
- The subject of the project.
-
Project - TaskUpdatesResource
#
- Whether updates to tasks update resources.
-
Project - Title
#
- The title of the project.
-
Project - UID
#
- The unique ID of the project.
-
Project - WeekStartDay
#
- Start day of the week. Values are: 0=Sunday, 1=Monday, 2=Tuesday, 3=Wednesday, 4=Thursday, 5=Friday, 6=Saturday
-
Project - WorkFormat
#
- The default work unit format. Values are: 1=m, 2=h, 3=d, 4=w, 5=mo
-
Resource - AccrueAt
#
- How cost is accrued against the resource. Values are: 1=Start, 2=End, 3=Prorated
-
Resource - ActiveDirectoryGUID
#
- The Active Directory GUID for the resource.
-
Resource - ActualCost
#
- The actual cost incurred by the resource across all assigned tasks.
-
Resource - ActualOvertimeCost
#
- The actual overtime cost incurred by the resource across all assigned tasks.
-
Resource - ActualOvertimeWork
#
- The amount of actual overtime work performed by the resource.
-
Resource - ActualOvertimeWorkProtected
#
- Specifies the duration through which actual overtime work is protected.
-
Resource - ActualWork
#
- The amount of actual work performed by the resource.
-
Resource - ActualWorkProtected
#
- Specifies the duration through which actual work is protected.
-
Resource - ACWP
#
- The actual cost of the work performed by the resource for the project to-date.
-
Resource - AvailabilityPeriod
#
- The period the resource is available.
-
Resource - AvailabilityPeriods
#
- A collection of periods during which the resource is available.
-
Resource - AvailableFrom
#
- The first date that the resource is available.
-
Resource - AvailableTo
#
- The last date the resource is available.
-
Resource - AvailableUnits
#
- The percentage that the resource is available during the specified period.
-
Resource - Baseline
#
- The baseline values for the resources.
-
Resource - BCWP
#
- The budgeted cost of of the work performed by the resource for the project to-date.
-
Resource - BCWS
#
- The budget cost of work scheduled for the resource.
-
Resource - BookingType
#
- Specifies the booking type of the resource. 1=Commited, 2=Proposed
-
Resource - CalendarUID
#
- The resource calendar.Refers to a valid UID in the Calendars element of the Microsoft Project XML Schema.
-
Resource - CanLevel
#
- Whether the resource can be leveled.
-
Resource - Code
#
- The code or other information about the resource.
-
Resource - Cost
#
- The total project cost for the resource across all assigned tasks.
-
Resource - CostPerUse
#
- The cost per use of the resource. This value is as of the current date if a rate table exists for the resource.
-
Resource - CostVariance
#
- The difference between the baseline cost and the cost.
-
Resource - CreationDate
#
- The date that the resource was created.
-
Resource - CV
#
- Earned value cost variance, through the project status date.
-
Resource - DurationFormat
#
- The format for expressing the bulk duration. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.
-
Resource - EmailAddress
#
- The email address of the resource.
-
Resource - ExtendedAttribute
#
- The value of an extended attribute. Two pieces of data are necessary - a pointer back to the extended attribute table which is specified either by the unique ID or the Field ID, and the value which is specified either with the value, or a pointer back to the value list.
-
Resource - FieldID
#
- The PID of the custom field.
-
Resource - Finish
#
- The scheduled finish date of the resource.
-
Resource - Group
#
- The group to which the resource belongs.
-
Resource - Hyperlink
#
- The title of the hyperlink associated with the resource.
-
Resource - HyperlinkAddress
#
- The hyperlink associated with the resource.
-
Resource - HyperlinkSubAddress
#
- The document bookmark of the hyperlink associated with the resource.
-
Resource - ID
#
- The position identifier of the resource within the list of resources.
-
Resource - Initials
#
- The initials of the resource.
-
Resource - IsEnterprise
#
- Specifies whether the resource is an Enterprise resource.
-
Resource - IsGeneric
#
- Specifies whether the resource is generic.
-
Resource - IsInactive
#
- Specifies whether the resource is set to inactive.
-
Resource - IsNull
#
- Specifies whether the resource is null.
-
Resource - MaterialLabel
#
- The unit of measure for the material resource.
-
Resource - MaxUnits
#
- The maximum number of units that the resource is available.
-
Resource - Name
#
- The name of the resource.
-
Resource - Notes
#
- Text notes associated with the resource.
-
Resource - NTAccount
#
- The NT account associated with the resource.
-
Resource - Number
#
- The unique number of the baseline data record.
-
Resource - OutlineCode
#
- The value of an outline code. Two pieces of data are necessary - a pointer back to the outline code table which is specified either by the unique ID or the Field ID, and the value which is specified either with the value, or a pointer back to the value list.
-
Resource - OverAllocated
#
- Whether the resource is overallocated.
-
Resource - OvertimeCost
#
- The total overtime cost for the resource including actual and remaining overtime costs.
-
Resource - OvertimeRate
#
- The overtime rate of the resource. This value is as of the current date if a rate table exists for the resource.
-
Resource - OvertimeRateFormat
#
- The units used by Microsoft Project to display the overtime rate. 1=m, 2=h, 3=d, 4=w, 5=mo, 7=y
-
Resource - OvertimeWork
#
- The amount of overtime work assigned to the resource.
-
Resource - PeakUnits
#
- The largest number of units assigned to the resource at any time.
-
Resource - PercentWorkComplete
#
- The percentage of work completed across all tasks.
-
Resource - Phonetics
#
- The phonetic spelling of the resource name. For use with Japanese only.
-
Resource - Rate
#
- The definition of a time period, and the rates applicable for the resource during that period.
-
Resource - Rates
#
- A collection of periods and the rates associated with each one.
-
Resource - RatesFrom
#
- The date that the rate becomes effective.
-
Resource - RatesTo
#
- The last date that the rate is effective.
-
Resource - RateTable
#
- The unique identifier of the rate table for the resource. Values are: 0=A, 1=B, 2=C, 3=D, 4=E
-
Resource - RegularWork
#
- The amount of non-overtime work assigned to the resource.
-
Resource - RemainingCost
#
- The remaining projected cost of the resource to complete all assigned tasks.
-
Resource - RemainingOvertimeCost
#
- The remaining projected overtime cost of the resource to complete all assigned tasks.
-
Resource - RemainingOvertimeWork
#
- The amount of remaining overtime work required to complete all tasks.
-
Resource - RemainingWork
#
- The amount of remaining work required to complete all assigned tasks.
-
Resource - Resource
#
- There must be at least one resource in each Resources collection.
-
Resource - Resources
#
- The collection of resources that make up the project.
-
Resource - StandardRate
#
- The standard rate of the resource. This value is as of the current date if a rate table exists for the resource.
-
Resource - StandardRateFormat
#
- The units used by Microsoft Project to display the standard rate. 1=m, 2=h, 3=d, 4=w, 5=mo, 7=y, 8=material resource rate (or blank symbol specified)
-
Resource - Start
#
- The scheduled start date of the resource.
-
Resource - SV
#
- Earned value schedule variance, through the project status date.
-
Resource - TimephasedData
#
- The time phased data
-
Resource - Type
#
- The type of resource. Values are: 0=Material, 1=Work
-
Resource - UID
#
- The unique identifier of the resource.
-
Resource - Value
#
- The actual value of the extended attribute.
-
Resource - ValueID
#
- The ID of the value in the extended attribut lookup table.
-
Resource - Work
#
- The total work assigned to the resource across all assigned tasks.
-
Resource - WorkGroup
#
- The type of workgroup to which the resource belongs. Values are: 0=Default, 1=None, 2=Email, 3=Web
-
Resource - WorkVariance
#
- The difference between the baseline work and the work as minutes x 1000.
-
Task - ActualCost
#
- The actual cost of the task.
-
Task - ActualDuration
#
- The actual duration of the task.
-
Task - ActualFinish
#
- The actual finish date of the task.
-
Task - ActualOvertimeCost
#
- The actual overtime cost of the task.
-
Task - ActualOvertimeWork
#
- The actual overtime work for the task.
-
Task - ActualOvertimeWorkProtected
#
- Specifies the duration through which actual overtime work is protected.
-
Task - ActualStart
#
- The actual start date of the task.
-
Task - ActualWork
#
- The actual work for the task.
-
Task - ActualWorkProtected
#
- Specifies the duration through which actual work is protected.
-
Task - ACWP
#
- The actual cost of work performed on the task to-date.
-
Task - Baseline
#
- The collection of baseline values of the task.
-
Task - BCWP
#
- The budgeted cost of work performed on the task to-date.
-
Task - BCWS
#
- The budgeted cost of work scheduled for the task.
-
Task - CalendarUID
#
- The task calendar.Refers to a valid UID in the Calendars element of the Microsoft Project XML Schema.
-
Task - ConstraintDate
#
- The date argument for the task constraint type.
-
Task - ConstraintType
#
- The constraint on the start or finish date of the task. Values are: 0=As Soon As Possible, 1=As Late As Possible, 2=Must Start On, 3=Must Finish On, 4=Start No Earlier Than, 5=Start No Later Than, 6=Finish No Earlier Than and 7=Finish No Later Than
-
Task - Contact
#
- The contact person for the task.
-
Task - Cost
#
- The projected or scheduled cost of the task.
-
Task - CreateDate
#
- The date that the task was created.
-
Task - Critical
#
- Whether the task is in the critical chain.
-
Task - CrossProject
#
- Whether the predecessor is part of another project.
-
Task - CrossProjectName
#
- The external predecessor project.
-
Task - CV
#
- Earned value cost variance.
-
Task - Deadline
#
- The deadline for the task to be completed.
-
Task - Duration
#
- The planned duration of the task.
-
Task - DurationFormat
#
- The format for expressing the Duration of the Task. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.
-
Task - EarlyFinish
#
- The early finish date of the task.
-
Task - EarlyStart
#
- The early start date of the task.
-
Task - EarnedValueMethod
#
- The method for calculating earned value. Values are: 0=Percent Complete, 1=Physical Percent Complete
-
Task - EffortDriven
#
- Whether the task is effort-driven.
-
Task - Estimated
#
- Whether the task is estimated.
-
Task - EstimatedDuration
#
- Whether the baseline duration of the task was estimated.
-
Task - ExtendedAttribute
#
- The value of an extended attribute. Two pieces of data are necessary - a pointer back to the extended attribute table which is specified either by the unique ID or the Field ID, and the value which is specified either with the value, or a pointer back to the value list.
-
Task - ExternalTask
#
- Whether the task is external.
-
Task - ExternalTaskProject
#
- The source location and task identifier of the external task.
-
Task - FieldID
#
- The PID of the custom field.
-
Task - Finish
#
- The scheduled finish date of the task.
-
Task - FinishVariance
#
- The variance of the task finish date from the baseline finish date as minutes x 1000.
-
Task - FixedCost
#
- The fixed cost of the task.
-
Task - FixedCostAccrual
#
- How the fixed cost is accrued against the task. Values are: 1=Start, 2=Prorated and 3=End.
-
Task - FreeSlack
#
- The amount of free slack.
-
Task - HideBar
#
- Whether the GANTT bar of the task is hidden when displayed in Microsoft Project.
-
Task - Hyperlink
#
- The title of the hyperlink associated with the task.
-
Task - HyperlinkAddress
#
- The hyperlink associated with the task.
-
Task - HyperlinkSubAddress
#
- The document bookmark of the hyperlink associated with the task.
-
Task - ID
#
- The position identifier of the task within the list of tasks.
-
Task - IgnoreResourceCalendar
#
- Whether the task ignores the resource calendar.
-
Task - Interim
#
- Whether this is an Interim Baseline.
-
Task - IsNull
#
- Specifies whether the task is null.
-
Task - IsSubproject
#
- Whether the task is an inserted project.
-
Task - IsSubprojectReadOnly
#
- Whether the inserted project is read-only.
-
Task - LagFormat
#
- The format for expressing the lag format. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.
-
Task - LateFinish
#
- The late finish date of the task.
-
Task - LateStart
#
- The late start date of the task.
-
Task - LevelAssignments
#
- Whether leveling can adjust assignments.
-
Task - LevelingCanSplit
#
- Whether leveling can split the task.
-
Task - LevelingDelay
#
- The delay caused by leveling the task.
-
Task - LevelingDelayFormat
#
- The format for expressing the duration of the delay. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.
-
Task - LinkLag
#
- The amount of lag in tenths of a minute.
-
Task - Milestone
#
- Whether the task is a milestone.
-
Task - Name
#
- The name of the task.
-
Task - Notes
#
- Text notes associated with the task.
-
Task - Number
#
- The unique number of the baseline data record.
-
Task - OutlineCode
#
- The value of an outline code. Two pieces of data are necessary - a pointer back to the outline code table which is specified either by the unique ID or the Field ID, and the value which is specified either with the value, or a pointer back to the value list.
-
Task - OutlineLevel
#
- The outline level of the task.
-
Task - OutlineNumber
#
- The outline number of the task.
-
Task - OverAllocated
#
- Whether the task is overallocated. This element is informational only.
-
Task - OvertimeCost
#
- The sum of the actual and remaining overtime cost of the task.
-
Task - OvertimeWork
#
- The amount of overtime work scheduled for the task.
-
Task - PercentComplete
#
- The percentage of the task duration completed.
-
Task - PercentWorkComplete
#
- The percentage of the task work completed.
-
Task - PhysicalPercentComplete
#
- The percentage complete value entered by the Project Manager. This can be used as an alternative for calculating BCWP.
-
Task - PredecessorLink
#
- Defines the predecessor task of the task that contains it.
-
Task - PredecessorUID
#
- The unique identifier of the predecessor task.
-
Task - PreLeveledFinish
#
- The finish date of the task before it was leveled.
-
Task - PreLeveledStart
#
- The start date of the task before it was leveled.
-
Task - Priority
#
- The priority of the task from 0 to 1000.
-
Task - Recurring
#
- Whether the task is a recurring task.
-
Task - RegularWork
#
- The amount of non-overtime work scheduled for the task.
-
Task - RemainingCost
#
- The remaining projected cost of completing the task.
-
Task - RemainingDuration
#
- The amount of time required to complete the unfinished portion of the task.
-
Task - RemainingOvertimeCost
#
- The remaining overtime cost projected to finish the task.
-
Task - RemainingOvertimeWork
#
- The remaining overtime work scheduled to finish the task.
-
Task - RemainingWork
#
- The remaining work scheduled to complete the task.
-
Task - Resume
#
- The date that the task resumed.
-
Task - ResumeValid
#
- Whether the task can be resumed.
-
Task - Rollup
#
- Whether the task is rolled up.
-
Task - Start
#
- The scheduled start date of the task.
-
Task - StartVariance
#
- The variance of the task start date from the baseline start date as minutes x 1000.
-
Task - Stop
#
- The date that the task was stopped.
-
Task - SubprojectName
#
- The source location of the inserted project.
-
Task - Summary
#
- Whether the task is a summary task.
-
Task - Task
#
- There must be at least one task in each Tasks collection.
-
Task - Tasks
#
- The collection of tasks that make up the project.
-
Task - TimephasedData
#
- The time phased data block associated with the task baseline.
-
Task - TotalSlack
#
- The amount of total slack.
-
Task - Type
#
- The type of task. Values are: 0=Fixed Units, 1=Fixed Duration, 2=Fixed Work.
-
Task - UID
#
- The unique ID of the task.
-
Task - Value
#
- The actual value of the extended attribute.
-
Task - ValueID
#
- The ID of the value in the extended attribut lookup table.
-
Task - WBS
#
- The work breakdown structure code of the task.
-
Task - WBSLevel
#
- The rightmost WBS level of the task.
-
Task - Work
#
- The amount of scheduled work for the task.
-
Task - WorkVariance
#
- The variance of task work from the baseline task work as minutes x 1000.
-
WBS Mask - GenerateCodes
#
- Whether WBS codes are generated for new tasks.
-
WBS Mask - Length
#
- The maximum length in characters. This element is omitted when length is "any".
-
WBS Mask - Level
#
- The level of the mask.
-
WBS Mask - Prefix
#
- The prefix for all WBS codes.
-
WBS Mask - Separator
#
- The separator character of the node.
-
WBS Mask - Type
#
- The type of the node value. The values are: 0=Numbers, 1=Uppercase Letters, 2=Lowercase Letters, 3=Characters.
-
WBS Mask - VerifyUniqueCodes
#
- Whether WBS codes are unique for new tasks.
-
WBS Mask - WBSMask
#
- The WBS Mask that is applied to all tasks in the Project.
-
WBS Mask - WBSMasks
#
- The table of entries that define the outline code mask.